Jacket legs and piles for the Hai Long 2/3 offshore wind foundations — 9,810 MT fabricated and loaded out for PTSC M&C, 2023.
| Client | Hai Long 2/3 Offshore Wind Power Co., Ltd – PTSC M&C |
| Product | Jacket legs and piles for offshore wind foundations |
| Scope | Fabrication and load-out |
| Quantity | 9,810 MT |
| Fabrication site | Ba Son Phu My yard (partner yard) |
| Period | 2023 |
| Country | Taiwan |
SREC fabricated foundation components for the Hai Long offshore wind farm, working to the dimensional and welding standards required for offshore wind structures. Large-diameter cans were rolled and welded into sections, moved on SPMTs inside the workshop, and prepared for load-out.
Offshore wind foundations differ from oil and gas jackets in tolerance philosophy: the interface with the transition piece and turbine tower leaves very little room for deviation, so survey control runs continuously through fabrication rather than only at the end.
About the project
Hai Long is one of the largest offshore wind developments in the Asia-Pacific region — 1,022 MW across three wind farms (Hai Long 2A at 300 MW, 2B at 232 MW and Hai Long 3 at 512 MW), located 45 to 70 km off the Changhua coast of Taiwan.