Block B Gas Project — Wellhead Platform Jacket and Piles · 10,000 tonnes · 2024

  • Home
  • Project
  • Block B Gas Project — Wellhead Platform Jacket and Piles · 10,000 tonnes · 2024

Client: PQPOC / PTSC M&C · Management, design, fabrication, and load-out of wellhead platform jacket and piles · 10,000 tonnes · 2024

Client PQPOC / PTSC M&C
Product Wellhead Jackets & Piles
Scope Management, Engineering, Fabrication, Sea-fastening, Load-out
Tonnage 10,000 tons
Fabrication Yard Ba Son Phu My Yard (Partner Yard)
Execution Period 2024
Country Vietnam

SREC fabricated the jackets and piles for wellhead platforms under the Block B Gas Field Development Project, executed on a turnkey basis from engineering to load-out under a single point of responsibility.

The scope of work included jacket assembly and erection at the yard, pile fabrication and coating, dimensional inspection per approved drawings, skidding of jackets onto transportation barges, and sea-fastening design and engineering for the offshore voyage.

About the Project

Block B — O Mon is Vietnam's largest gas project, located in the Malay — Tho Chu basin, approximately 330 km off the coast of Ca Mau at a water depth of 60–80 meters. The 2P recoverable reserves are estimated at approximately 3.78 trillion cubic feet of gas, with a stable production rate of around 490 million cubic feet per day, supplying the O Mon power plant cluster via a 433 km pipeline. The project reached its Final Investment Decision (FID) in March 2024.

Project Video

Fabrication, erection, and load-out of four wellhead platform jackets at SREC Yard, Phu My

Comments (0)

Hide comments

No comments yet - be the first!

Leave a comment

You are replying to Cancel reply