Gallaf Batch 3 — GE Piles, Qatar · 5,000 MT · 2022–2023

  • Home
  • Project
  • Gallaf Batch 3 — GE Piles, Qatar · 5,000 MT · 2022–2023

Client: North Oil Company / PTSC M&C · API 2B jacket piles for JA and KA jackets · 5,000 MT · 2022–2023

Client North Oil Company / PTSC M&C
Product API 2B tubular jacket piles — JA and KA jackets (OD 2,180 × 60 mm WT × 97,000 mm)
Scope Fabrication, coating, load-out and sea-fastening
Quantity 5,000 MT (2,500 MT each)
Fabrication site Ba Son Phu My yard (partner yard)
Period 2022 – 2023
Country Qatar

SREC fabricated large-diameter pin piles for the Gallaf Batch 3 wellhead platform packages. Cans were rolled, longitudinally welded and fitted up into strings, with full non-destructive testing of every circumferential seam. Completed piles were coated, laid out for final survey, then skidded and loaded onto the transport barge with welded sea-fastening designed for the open-sea tow to Qatar.

About the project

Al Shaheen is Qatar’s largest offshore oil field, operated by North Oil Company, a joint venture of QatarEnergy and TotalEnergies. It lies roughly 80 km north of Ras Laffan in about 60 m of water and accounts for close to 45% of Qatar’s oil production. The Gallaf Batch 3 expansion is intended to lift field output beyond 300,000 barrels per day.