AQWA Superstructure · 90 tonnes · 2025

  • Home
  • Project
  • AQWA Superstructure · 90 tonnes · 2025

Client: PVC-MS · Topsides fabrication · 90 tons · 2025

Client PVC-MS
Product Topside
Scope Fabrication
Tonnage 90 tons
Fabrication Yard Ba Son Phu My Yard (Partner Yard)
Execution Period 2025
Country Vietnam

SREC fabricated the AQWA topside package for PVC-MS, including structural steel, deck plating, walkway structures, and equipment supports.

The scope of work was executed in accordance with customer-approved drawings and welding procedures, with dimensional control at each erection step, followed by surface preparation and complete coating at the SREC yard prior to handover.

Comments (0)

Hide comments

No comments yet - be the first!

Leave a comment

You are replying to Cancel reply