Gallaf Batch 3 — Piles & Subsea Template, Qatar · 5,000 MT · 2022–2023

  • Home
  • Project
  • Gallaf Batch 3 — Piles & Subsea Template, Qatar · 5,000 MT · 2022–2023

Client: North Oil Company / DSME / PTSC M&C · API 2B jacket piles and subsea template · 5,000 MT · 2022–2023

Client North Oil Company / DSME / PTSC M&C
Product API 2B tubular jacket piles (OD 2,438 × 60 mm WT × 102,000 mm) and subsea template
Scope Fabrication, coating, dimensional control, load-out
Quantity 5,000 MT
Fabrication site Ba Son Phu My yard (partner yard)
Period 2022 – 2023
Country Qatar

SREC fabricated pin piles and a subsea template for the Gallaf Batch 3 expansion of the Al Shaheen field. The subsea template — a large welded steel frame that positions and guides the wellhead conductors on the seabed — demanded tight dimensional tolerances across the full assembly, verified by survey at each hold point before coating and load-out.

About the project

Al Shaheen is Qatar’s largest offshore oil field, operated by North Oil Company, a joint venture of QatarEnergy and TotalEnergies. It lies roughly 80 km north of Ras Laffan in about 60 m of water and accounts for close to 45% of Qatar’s oil production. Before the Gallaf Batch 3 expansion the field had over 300 active wells across 33 platforms; the expansion is intended to lift output beyond 300,000 barrels per day.

Comments (0)

Hide comments

No comments yet - be the first!

Leave a comment

You are replying to Cancel reply