Client: Vietsovpetro · Management and fabrication of topside modules and bridges · 1,200 tons · 2026
| Client | Vietsovpetro Joint Venture |
| Product | Topsides & Bridges |
| Scope | Management and Fabrication |
| Tonnage | 1,200 tons |
| Fabrication Yard | Vietsovpetro Yard, Vung Tau |
| Execution Period | 2026 — Completed |
| Country | Vietnam |
SREC managed and fabricated the topside and bridge for the BK-26 wellhead platform. The work package included primary and secondary structural steel, deck plating and grating, stairways and handrails, pipe supports, and the bridge structure connecting BK-26 to the adjacent platform.
The work was executed at the Vietsovpetro yard in Vung Tau with full dimensional control at every erection step, followed by surface preparation, coating, and pre-commissioning prior to handover. The completed topside was positioned onto support skids and prepared for load-out.