Gallaf Project Phase 3 — Subsea Piles and Templates, Qatar · 5,000 tonnes · 2022–2023

  • Home
  • Project
  • Gallaf Project Phase 3 — Subsea Piles and Templates, Qatar · 5,000 tonnes · 2022–2023

Client: North Oil Company / DSME / PTSC M&C · API 2B jacket piles and subsea template · 5,000 tonnes · 2022–2023

Client North Oil Company / DSME / PTSC M&C
Product API 2B Jacket Piles (OD 2,438 × 60 mm thk × 102,000 mm lg) & Subsea Template
Scope Fabrication, Coating, Dimensional Inspection, Load-out
Tonnage 5,000 tons
Fabrication Yard Ba Son Phu My Yard (Partner Yard)
Execution Period 2022 – 2023
Country Qatar

SREC fabricated the piles and subsea template for the Gallaf Phase 3 expansion package of the Al Shaheen field. The subsea template — a large welded steel structure used to position and guide subsea well conductors on the seabed — requires very tight dimensional tolerances across the entire assembly, verified at every hold point prior to coating and load-out.

About the Project

Al Shaheen is Qatar's largest offshore oil field, operated by North Oil Company — a joint venture between QatarEnergy and TotalEnergies. Located approximately 80 km north of Ras Laffan at a water depth of about 60 meters, the field accounts for nearly 45% of Qatar's oil production. Prior to the Gallaf Phase 3 expansion, the field had over 300 active wells across 33 platforms; the expansion package aims to boost production to over 300,000 barrels per day.